City of Aledo Public Works Building Concrete Floor

Work consists of replacing existing concrete shop floor and trench drain in the Street Department Bay. The Gas Department Bay will receive a new concrete floor and trench drain.
  Specifications (click to expand/collapse)
Name Size
20190729 Project Manual 821.4 KB